JW MARRIOTT ORLANDO
JW MARRIOTT TOWER – GRANDE LAKES ORLANDO
SCOPE OF WORK
EXTERIOR
Sliding door assembly replacement and balcony stripping and painting.
Exterior pressure washing, crack repair, stucco replacement, metal flashing replacement, specialty elastomeric coating.
North facade foam column removal, redesign, and encapsulate.
Roof tile cleaning and sealing
Permanent davit fabrication by spec and installation. roof patch around davit bed.
Cupola repainting and waterproofing assembly.
ARCHITECT
Wiss, Janney, Elstner Associates, Inc.
YEAR COMPLETED
2018